TRAIL REPORT:


TRAIL IS OPEN.

#Ride_it!

**Phase 3 Section on Map is Complete!**
Also the trail makes "future loop" is also rideable, but not signed.


**FULL LOOP is Riding around 3.4 MILES!**


CHECK OUT A SAMPLE OF MTNVIEW TRAIL VIDEO HERE!.


Singletrack Projected Phases

Singletrack Projected Phases
Trail was designed to ride Counter Clockwise from the Parking lot. "If riding in Reverse Direction, Yield to Oncoming Riders." * Click on map for downloadable version*

Monday, October 17, 2011

Perfect Fall Day! 10-16-11

Went out with the Girls on Sunday to check out the trails, they got on their bikes and just took off. I followed thinking it wouldn't last long, but they keep going and over heard at one point, my oldest yelling, "THIS IS AWESOME!" They both ended up riding/STRIDING the whole lap!
All Levels!
Dad can we do another lap?
Barry sneaking down from Duluth with Pam to hit up a few laps after a morning stop at Maplelag and hitting up Cuyuna the day before.

Monday, September 26, 2011

Riders!

Good to see riders at the trailhead on Saturday morning!  New section is complete and rides well making the full loop around 1.8 miles with a mix of singletrack and doubletrack(ski trail).

Wade, Jeremy and Todd getting ready to head out.

Friday, September 23, 2011

BRAND NEW SECTION

New Section along the the South Border is now ride-able and signed.
Wade at the top of the climb at the entrance of the new section.

Friday, September 9, 2011

Trail Report 9/9/11 = Buffed Out!

Singletrack is buffed out and seeing fat tire action!  Good to See!
The Trail is Dry and Glowing!

Thursday, August 11, 2011

8/11/11 Trail Report

Singletrack is dry and fast and was cleared of all debris last night with blower. 2 of the 3 trees that were down have been cut out and one can be rode around right now. New Trail Signs have been put in place with Arrowed graphics. Also cut a Easier Spur Trail Entry to skip over The more difficult climbing section, (follow signs / see map above).
Planning on also re routing B-line option on Inside section as well.
A bright surprise as you round a corner before log pile.
New fungi growth on tree along trail, BRIGHT Orange very cool.
New Signage in place 
(Thanks to BrushMARKS for printing the reflective decals and Becker County Hwy Dept for the sign posts.)

Monday, May 9, 2011

5/5/11

Wood Chips and Trail Salsa for lunch today for Cinco De Mayo, Riding with Jay Richards. (pic by jay)
From May 5, 2011

Friday, April 29, 2011

Trailwork

Thanks to the volunteers last night on the new section of singletrack.
We are over half way done with the ground work.  The line is dialed and cleared mostly to the end and is easy to navigate for riding if one wants to check it out.  Just needs finishing touches with the ground work to complete the main trail bed along with some berm work and dialing in some obstacles in the rock sections.
 Guest Trail Tester "Marlo" Getting in on the action enjoying what she sees!
Volunteers Jeremy & Jason
Jeremy hitting the switchback climb.

Tuesday, April 26, 2011

A-Line!

4/25/11 Trailwork
Uncovering the skeleton!

Jeremy Dirk Testing and cleaning the A-Line!
(shot from cell phone, so low quality..sorry)
 Jake Richards Rollin' the big wheels!

Monday, April 25, 2011

TRAIL IS OPEN!

Cut downed trees off the trail on Saturday and cleared sticks and blew out 1st section.
Trail drained nicely after Friday's rain which is a a good sign!
Planning trail work for Monday April 25th and Thursday April 28th at 5:30 for those interested in helping. Exit section needs to be cleaned up and will be starting on cutting new section of trail.
Call or Text Tony if your interested in helping. (841-5724)
From MtnVIEW Singletrack 2011


From MtnVIEW Singletrack 2011


From MtnVIEW Singletrack 2011